11–12 Dec 2008
CERN
Europe/Zurich timezone

WG 3

  FIRST SPL COLLABORATION MEETING<o:p></o:p>

11-12 December 2008<o:p></o:p>

<o:p> </o:p>Working Group 3 on <o:p></o:p>

<o:p></o:p>

CRYO-MODULES DESIGN AND INTEGRATION<o:p></o:p>

(design, construction, assembly…) <o:p></o:p>

<o:p> </o:p>GOALS:<o:p></o:p>

  1. Understand limits of scope of CEA and CNRS contributions<o:p></o:p>
  2. Identification of integration needs: components type, interfaces, functional needs (ex.cooling power HOM) <o:p></o:p>
  3. Identify uncovered items and possible distribution to institutes interested<o:p></o:p>
  4. Define list of topics towards a functional specification: alignment requirements, thermal budgets (static+dynamic), mechanical requirements<o:p></o:p>
  5. Define input for mechanical layouts, cryogenics specs (pressures & temperatures)<o:p></o:p>
  6. Define the key ingredients for defining a layout for tunnel interfaces: longitudinal layout, interconnect space, coupler layout (vertical, lateral?)<o:p></o:p>
  7. Elaborate a work organization structure  <o:p></o:p>