Speaker
Vincent Baglin
Description
Following the sector 3-4 incident, about 5 km of beam vacuum system have been spoiled with soot, metallic and super insulation debris. During four months, several teams have intensively worked to recover the beam vacuum system. The presentation will address the successive sequences of this activity in terms of preparation, execution and control. Steps where time was lost and the possible optimisations will be presented. The obtained quality performance of the cleaning activity and possible qualification means will be showed.